MID-RISE FABRICATION SPEED, PREDICTABILITY & ACCOUNTING TRANSPARENCY ENABLE REDUCED PROJECT SCHEDULES & DIVERSE INVESTMENT STRATEGIES FOR REAL ESTATE INVESTORS/DEVELOPERS
PROVIDEIING "WHITE LABEL" PRODUCTS TO FABRICATORS & GEN. CONTRACTORS MID-RISE FABRICATES 2D-PANELS + 3D-VOLUMETRIC MODULES AND PROVIDES INTEGRATION/SUPPORT THROUGH ALL STAGES OF THE PROJECT
AN INNOVATIVE & EXPANDED DESIGN PALETTE, ALONG WITH BIM SUPPORT, IS PROVIDED TO ARCHITECTS - LICENSED IN-HOUSE MID-RISE PROS COORDINATE ALL MODULAR CODE COMPLIANCE
CHALLENGE:
1.6 BILLION WORLD-WIDE WITHOUT ADEQUATE HOUSING
FULFILLING A CRITICAL ROLE ON THE PLANET - WE FABRICATE PANELS & VOLUMETRIC SOLUTIONS FOR MULTI-FAMILY, STUDENT, ASSISTED LIVING & LUXURY & AFFORDABLE HOUSING PROJECTS
CHALLENGE:
200 MILLION TONS OF CONSTRUCTION WASTE ANNUALLY
ENVIRO-CONSCIOUS STRATEGIES ARE EMPLOYED AT ALL LEVELS OF DESIGN, FABRICATION, DELIVERY & CONSTRUCTION - OUR PROCESSES & PRODUCTS DO NOT JUST SUSTAIN, THEY THRIVE!
CHALLENGE:
ANTIQUATED AND CHANGE-ORDER PRONE GEN. CONSTRUCTION METHODS
BEST BUSINESS PRACTICES COMBINED WITH MODULAR DESIGN & FABRICATION EXPERIENCE FUEL OUR DELIVERY OF QUALITY PRODUCTS, REDUCED SCHEDULES & AFFORDABLE PRICE-POINTS
MID-RISE has an award winning in-house licensed Architect/Design Studio creating “Productized Architecture”. Design solutions are crafted from a palette/menu of predesigned models in a shortened time frame - usually 4 to 8 weeks. Our vast experience in design, fabrication, assembly, delivery & construction provides for the rapid delivery of your building project. In addition, repetitious use of project plans and designs is encouraged - enabling future projects to move at an even more accelerated pace than standard/first time design projects.
Traditional Construction: 8-12 Months
MID-RISE Modular: 1-2 Months
A team of seasoned professionals navigate the entitlement and permit process through the State (California Housing & Development - HCD) and through the local governing City/County Building Dept. This phase of the project development provides for the most efficient processing of drawings and documents for building code compliance. In-house plan check and inspection services expedite the permitting and fabrication approvals, eliminating the wasteful time spent on traditional plan check and building inspection.
Traditional Construction: 8-12 Months
MID-RISE Modular: 10-12 Months
Utilizing our 2D(Panelized System) or our 3D(Volumetric System), MID-RISE provides the optimal solution for your project. Our projects are constructed with heavy and light gauge steel assemblies - not wood! Exceeding structural, fire safety and embracing sustainable materials/practices are standard for MID-RISE. Factory controlled fabrication assures the highest quality modules and a smooth interface with General Contractors.
Traditional Construction: 24-36 Months
MID-RISE Modular: 12-18 Months
Our module fabrication begins concurrently with the General Contractor’s groundbreaking/start of foundation construction. This allows MID-RISE to pursue a critical path construction schedule - not a linear path as in traditional construction. Along with our Design/Architectural process & Entitlement/Permitting, our fabrication/construction sequencing provides a significantly faster path to completion than traditional projects. Herein lies the value proposition that speaks to real project savings. Projects that are completed in 50 to 60% of the time required to build traditional projects provide a savings in carrying costs (insurance, security, loan payments, exposure to theft/weather/unknowns, etc. In addition, the return on the project investment dollar happens months, if not years, earlier than traditionally designed and constructed projects. MODULAR (3-D volumetric steel building systems) & PANELS (2-D metal/steel panel systems) offer numerous advantages over traditional metal and/or wood stick framing, including precision, faster installation, reduced material waste, improved structural integrity, enhanced thermal performance, design flexibility, soundproofing/fire resistance and cost savings. These solutions are rapidly becoming the choice for many construction projects, seeking durability, stability & sustainability. The choice between MODULAR and PANELS depends on project-specific requirements, such as timeline, budget, design complexity, logistics and desired level of customization. Uniquely, MID-RISE MODULAR solutions provide the greatest value proposition of "SPEED" - design, permitting & construction schedules can be reduced up to 50%, thus eliminating extended carrying costs while providing a faster return on building investment dollars.
Traditional Construction: 36-60 Months
MID-RISE Modular: 24-30 Months
MODULAR (3-D volumetric steel building systems) & PANELS (2-D metal/steel panel systems) offer numerous advantages over traditional metal and/or wood stick framing, including precision, faster installation, reduced material waste, improved structural integrity, enhanced thermal performance, design flexibility, soundproofing/fire resistance and cost savings.
MODULAR solutions are rapidly becoming the choice for many construction projects, seeking durability, stability & sustainability and the choice between MODULAR and PANELS depends on project-specific requirements, such as timeline, budget, design complexity, logistics and desired level of customization.
Uniquely, MID-RISE MODULAR solutions provide the greatest value proposition of "SPEED" - design, permitting & construction schedules can be reduced up to 50%, thus eliminating extended carrying costs while providing a faster return on building investment dollars.
Precision and Consistency:
Offers higher precision/consistency compared to wood framing. Manufactured to exact specs, ensuring straightness, resulting in a more accurate & uniform construction process.
SCORE: 5
Installation Time:
Typically lighter, easier to handle & faster to install than wood framing. Longer lengths reduce need for joining multiple pieces on-site.
SCORE: 3
_______________________________________________
Reduced Material Waste:
Generates less material waste compared to wood framing. Studs come in pre-cut lengths, minimizing on-site cutting & resulting in less waste. Metal framing materials are recyclable.
SCORE: 5
_______________________________________________
Improved Structural Integrity:
Provides superior structural integrity compared to wood framing. Near zero susceptibility to warping, shrinking or rotting.
SCORE: 5
_______________________________________________
Enhanced Thermal Performance:
Offers comparable or slightly better thermal performance than wood. Not susceptible to moisture-related issues of rotting & mold, which degrades insulation effectiveness.
SCORE: 6
_______________________________________________
Design Flexibility:
Offers similar design flexibility to wood. Can be easily customized & manipulated to accommodate various architectural designs, building layouts, & structural requirements.
SCORE: 9
_______________________________________________
Soundproofing & Fire Resistance:
Provides better soundproofing & fire resistance compared to wood framing. Complies with UL listed assemblies for non-combustible metal can achieve higher fire ratings than wood.
SCORE: 7
_______________________________________________
Short & Long-Term Cost Savings:
Results in long-term cost savings due to durability & low maintenance requirements. May have a higher initial cost compared to wood framing but the reduced risk of structural issues, lower maintenance costs, & longer lifespan leads to savings over the building's lifetime. This system follows traditional construction methods and thus is vulnerable to standard frequency of change order directives.
SCORE: 3
_______________________________________________
METAL STICK FRAME SCORE/RATING
43
Precision and Consistency:
Offers precision/consistency due to off-site fabrication - wall, floor & ceiling panels are assembled on-site rather than being delivered as stick frame pieces or complete modules.
SCORE: 8
Installation Time:
Offers much faster installation compared to metal stick framing but require more on-site assembly time compared to MODULAR.
SCORE: 7
_______________________________________________
Reduced Material Waste:
Reduces material waste compared to stick framing but may generate more waste than MODULAR construction due to the need for on-site assembly & customization.
SCORE: 8
_______________________________________________
Improved Structural Integrity:
Provides enhanced structural integrity but has limitations compared to MODULAR, especially load-bearing capacity and overall rigidity.
SCORE: 7
_______________________________________________
Enhanced Thermal Performance:
Provides good thermal performance compared to stick frame but offers slightly less quality insulation compared to MODULAR due to their construction methodology.
SCORE: 7
_______________________________________________
Design Flexibility:
Offers greater design flexibility compared to MODULAR as panels can accommodate a limitless variety of architectural designs, building layouts. & panel sizes.
SCORE: 8
_______________________________________________
Soundproofing & Fire Resistance:
Engineered to provide excellent soundproofing & fire resistance - meeting or exceeding building code requirements. with UL listed assembly ratings
SCORE: 8
______________________________________________
Short & Long-Term Cost Savings:
Offers long-term cost savings compared to traditional stick framing, but the extent of savings may vary depending on factors such as project size, complexity, and location. In a supporting role to General Contractors, MID-RISE creates BIM files for use across all engineering & construction disciplines. Digital twins carefully integrate & coordinate all subcontractor trade layouts on-site - resulting in reduced change-order potential.
SCORE: 6
_______________________________________________
2D-METAL PANELS SCORE/RATING
59
Precision and Consistency:
Fabrication of entire building modules is off-site in a controlled factory environment. Ensures precision & consistency in measurements/quality.
SCORE: 10
Installation Time:
Has the fastest installation time compared to all other systems. Fabricated off-site, transported to building site & rapidly installed.
SCORE: 10
_______________________________________________
Reduced Material Waste:
Produces less material waste compared to all other systems because modules are fabricated to precise specifications, minimizing the need for on-site cutting and trimming.
SCORE: 10
_______________________________________________
Improved Structural Integrity:
Offers excellent structural integrity - building modules are fabricated with integrated steel framing, ensuring robustness & stability.
SCORE: 9
_______________________________________________
Enhanced Thermal Performance:
Allows for better install & integration of a wide range of insulation types, resulting in improved thermal performance, energy efficiency & reduced heating/cooling costs.
SCORE: 10
_______________________________________________
Design Flexibility:
Offers design flexibility, but it may be constrained by the need for standardized module sizes, transportation considerations and/or construction site access logistics.
SCORE: 7
_______________________________________________
Soundproofing & Fire Resistance:
Incorporates factory installed soundproofing/fire-resistant materials and fire sprinkler/suppression systems into UL listed assemblies that create the module envelope,.
SCORE: 10
_______________________________________________
Short & Long-Term Cost Savings:
Results in short term & long-term cost savings due to faster construction timelines, reduced labor costs, minimized material waste & improved energy efficiency. Along with improved quality, construction SPEED may be the greatest value proposition for a modular buildiing strategy. schedules can be reduced up to 50%, thus eliminating extended carrying costs while providing a faster return on building investment dollars.
SCORE: 10
_______________________________________________
3D-VOLUMETRIC MODULAR SCORE/RATING
76
MODULAR DESIGN + ARCHITECTURE + FABRICATION